You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakut Bangun 2 Crossing di Tugu Selatan

Two Crossing Channels Built to Overcome Inundation in Tugu Selatan

North Jakarta Water Resources (SDA) Sub-department builds crossing channel at RT 08 and RT 09 of RW 04, Tugu Selatan, Koja. This channel will be used to drain water from settlements to Cakung Lama River.

After flood, we were asked to evaluate and overcome the problems

Tugu Selatan Urban Village Head, Sukarmin mentioned, crossing channel is built to overcome the flood because that settlement was previously flooded in early January. Based on the evaluation result, his side found out that channel in the settlement was often clogged and potentially cause inundation.

"After flood, we were asked to evaluate and overcome the problems," he stated, Monday (1/20).

Channel on Jalan Pintu Besar Selatan Drained

His side tries to solve the problem by building crossing channel as long as 5 meters in two locations. First is located at RT 08/04 with width 60 centimeters and second with width 100 meters at RT 09/04.

"We hope this crossing channel can solve drainage system in RW 04 settlement. It takes around two weeks to build these crossing channels," he asserted.

Linked News
Popular News indeks
  1. Jakarta Builds Five New Animal Health Centers to Expand Veterinary Services

    access_time30-09-2026 remove_red_eye490 personAldi Geri Lumban Tobing
  2. Buildings on the Sidewalk in Front of Plumpang Transjakarta Bus Stop Demolished

    access_time30-09-2026 remove_red_eye407 personAnita Karyati
  3. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye379 personAldi Geri Lumban Tobing
  4. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye338 personDessy Suciati
  5. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye322 personFakhrizal Fakhri